A134–2009

A134–2009 (formerly A131CMc–2003), Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee without a Guarantee Maximum Price
$35.70

Similar to AIA Document A133™–2009, AIA Document A134™–2009 is intended for use when the owner seeks a construction manager who will take on responsibility for providing the means and methods of construction. However, in AIA Document A134–2009 the construction manager does not provide a guaranteed maximum price (GMP). A134–2009 employs the cost-plus-a-fee method, wherein the owner can monitor cost through periodic review of a control estimate that is revised as the project proceeds.

The agreement divides the construction manager’s services into two phases: the preconstruction phase and the construction phase, portions of which may proceed concurrently in order to fast track the process. A134–2009 is coordinated for use with AIA Documents A201™–2007, General Conditions of the Contract for Construction, and B103™–2007, Standard Form of Agreement Between Owner and Architect for a Large or Complex Project. A134–2009 replaces AIA Document A131™CMc–2003 (expired May 31, 2010).

CAUTION: To avoid confusion and ambiguity, do not use this construction management document with any other AIA construction management document.