A141–2004

A141–2004, Agreement Between Owner and Design-Builder
$35.70

AIA Document A141™–2004 replaces AIA Document A191™–1996 and consists of the agreement and three exhibits: Exhibit A, Terms and Conditions; Exhibit B, Determination of the Cost of the Work; and Exhibit C, Insurance and Bonds. Exhibit B is not applicable if the parties select to use a stipulated sum. AIA Document A141–2004 obligates the design-builder to execute fully the work required by the design-build documents, which include A141 with its attached exhibits, the project criteria and the design-builder’s proposal, including any revisions to those documents accepted by the owner, supplementary and other conditions, addenda and modifications. The Agreement requires the parties to select the payment type from three choices: (1) Stipulated Sum, (2) cost of the work plus design-builder’s fee, and (3) cost of the work plus design-builder’s fee with a guaranteed maximum price. A141–2004 with its attached exhibits forms the nucleus of the design-build contract. Because A141 includes its own terms and conditions, it does not use AIA Document A201™.

CUSTOMERS WHO BOUGHT THIS PRODUCT ALSO BOUGHT

A142–2004

A142–2004, Agreement Between Design-Builder and Contractor
$35.70

A133–2009

A133–2009 (formerly A121CMc–2003), Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price
$35.70